Basement Remodel 2
The basement is a mess and so much stuff has to be donated and cleaned out. However, while it's snowing outside - I would like to get a section of framing put up every weekend. It's really hard to get 4x8 plywood up from the driveway to the basement steps - so I will stick with the framing until May to get the plywood bought and put up. It doesn't look like much and I am only focusing on minimal framing at the moment. I will go back and insert additional support and strength but the framing needs to be completed so that I can determine any structural issues like boxing in venting.
This is going to be a long term project so have to have lots of patience.